Restaurant opening and closing shift checklists

FixTech editorial team · Updated

Checklist for opening and closing a restaurant shift: readiness of the team, menu, equipment and transfer of tasks. Two templates for the daily work of a manager.

Here we are talking about the daily shift of an operating restaurant. Launching a new business requires a separate project. Before opening, the manager confirms that the restaurant is ready to serve guests, and when closing, he transfers the status of the establishment to the next team. Each stage needs a scheduled time, an assigned employee and a clear acceptance criterion.

Opening: staff and information

  1. Accept the transfer from the previous shift. Read records of malfunctions, consumables shortages, and unfinished tasks. Clarify who is responsible for each fix.
  2. Confirm team composition. Assign the dining room, kitchen areas and manager responsibilities. Identify a replacement in case of employee absence.
  3. Give a short briefing. Inform menu changes, list of unavailable dishes, booking details and planned workload.
  4. Check staff access permissions. The employee should use his account and see only the necessary transactions.

Opening: rooms and work tools

  • Check the readiness of the entrance area, dining room, workstations and sanitary facilities according to approved internal standards.
  • Ensure traffic routes are clear and defective items are removed from use.
  • Inspect the equipment and check that it starts according to the manufacturer's instructions. Please refer emergency situations to the responsible specialist.
  • Check whether the menu is up to date, prices and availability of dishes in the sales channels used.
  • Check device communication, order transmission and backup method of operation in case of technical failure.
  • Cash transactions are performed by an authorized employee according to the adopted regulations; The general checklist does not replace cash register instructions.

How to Decide About Readiness

Don't reduce acceptance to percentage of items completed. A missing napkin and a failure affecting safety or serviceability have different weights. For critical deviations, determine in advance who makes the decision to start work, limit a specific area, or postpone the opening. The malfunction must have a person responsible and a deadline for rechecking.

Closing: sequence of actions

  1. Complete service or formally transfer remaining orders to the responsible team.
  2. Review disputed cancellations, returns and unpaid items with the authorized manager.
  3. Record movements of products and consumables that have not yet been accounted for. Don't put them off without a written handover for the next shift.
  4. Clean each area and have it checked according to the restaurant’s approved procedure.
  5. Prepare equipment for break as instructed. Do not turn off devices that require continuous operation.
  6. Create a shift handover: problem, current status, temporary solution, person responsible, deadline.
  7. Close accesses and follow the prescribed procedure for shutting down the room.

Example of submitting an unfinished task

“The printer at the service station is producing incomplete printouts. Orders are transferred to the backup device according to the agreed scheme. The request to the specialist has been registered, the person in charge is the day shift manager. Check before service begins." Such a record has an action and a task owner. The wording “printer is broken” leaves the next shift without instructions.

Handover fieldWhat to write down
Date and shiftWhen a deviation is detected
Zone or DeviceExact location of the problem
WorkaroundHow work is organized now
Responsible and deadlineWho checks the result and when
AcceptanceWho confirmed that the issue was resolved

How to check the checklist itself

After several shifts, compare records with repeated failures. If one problem appears every day, process, supply, or training must be changed. Adding new boxes without addressing the cause increases the workload, but not the readiness of the restaurant.

Download two templates: opening and closing a shift (DOCX). For cleaning use separate check by zones. Organize orders, warehouse and team work on the page restaurant automation FixTech.

Frequently asked questions

Who signs the closing?

Those responsible for the zones confirm their part, the manager accepts the transfer as a whole. The authority and signature procedure are fixed by the internal rules of the institution.

What to do with an unfulfilled item?

Record the reason, action, assigned employee and deadline. Don't mark an item as completed just to complete the form.